McCormick Place Alternate Care Facility

Client

Schedule

Market

Project Profile

Bowa Construction provided construction management services for the conversion of the McCormick Place Convention Center into a COVID-19 alternate care facility. The temporary facility, designed to relieve pressure on City of Chicago hospitals, contains a total of 3,000 beds throughout all three halls of the convention center separated by level of care required. Halls A and C consist of three-sided hard cubes with a curtain front including nurses stations and nurse call capability. Hall B consists of a total of 750 beds including contained patient isolation pods with negative pressure. A rack system behind the pods houses the duct work, piping and conduits for medical gas, HVAC and the electrical and mechanical connections necessary to feed air, electric and medical gas to each pod.

Share

Explore More Projects

Share