Bowa Construction provided construction management services
for the American Airlines (AA) G/L Gate Swap project located in
both Terminals 2 and 3 at O’Hare International Airport.
TERMINAL 2: Scope of work consisted of demolishing the existing Air Canada baggage claim office located on Level 1 and replacing it with a new, renovated JetBlue baggage claim. In addition, the existing AA offices and ticketing booths located on Level 2 were demolished and remodeled for both Alaska Airlines and JetBlue.
TERMINAL 3: Scope of work consisted of remodeling and modifying the existing AA office spaces at the Apron Level below Gates G2 and G4 for both Alaskan Airlines and Spirit Airlines. The same was completed for the existing Spirit Airlines office spaces at the Apron Level below Gate L1 and L4 to suit requirements for AA. In order to ensure all airport passengers and staff remained safe and unaffected during the course of construction, hard wall partitions were installed around all affected gates and uninstalled upon completion.
TERMINAL 2: Scope of work consisted of demolishing the existing Air Canada baggage claim office located on Level 1 and replacing it with a new, renovated JetBlue baggage claim. In addition, the existing AA offices and ticketing booths located on Level 2 were demolished and remodeled for both Alaska Airlines and JetBlue.
TERMINAL 3: Scope of work consisted of remodeling and modifying the existing AA office spaces at the Apron Level below Gates G2 and G4 for both Alaskan Airlines and Spirit Airlines. The same was completed for the existing Spirit Airlines office spaces at the Apron Level below Gate L1 and L4 to suit requirements for AA. In order to ensure all airport passengers and staff remained safe and unaffected during the course of construction, hard wall partitions were installed around all affected gates and uninstalled upon completion.