Bowa Construction was selected to perform complete turnkey general contracting and design build services from pre- construction to final completion. Specific work performed include developing and maintaining project schedules, budgeting, estimating, subcontractor’s and project management.

The 2032 Clifton Avenue in Chicago, IL was a total renovation from a previous four (4) residential unit conversion to a massive single family home. Bowa Construction dug out the existing lower level basement a total of 3 feet to provide the height of cathedral ceilings.

Additionally, Bowa Construction installed a total of 20 tons of steel to support the structural elevations for this multistory building, as well as new carpentry, framing, HVAC, plumbing and mechanical systems for the complete duration of this project.

This project was completed on time and on budget.

Leave a Reply

Your email address will not be published. Required fields are marked *